• Fives Stein

    2012 - Saudi Arabi - Industrie verrière

    Repair of joint above the burner

  • TATA STEEL

    2012 - UK, Port Talbot - Sidérurgie

    BF#5 Gunning of uptakes down-comer and top cone

  • Saint Gobain

    2012 - Bhiwadi, India - Industrie verrière

    Sealing  of the new float line glass furnace 

  • Fives Stein

    2012 - Turkey, Duzce - Industrie verrière

    Repair of joint above the burner

  • TERNIUM SIDERAR

    2012 - Argentina, San Nicolas - Sidérurgie

    BF#2 Cleaning walls and tuyere area, ramming of new stave joints and injection between staves and shell

  • ARCELORMITTAL

    2012 - Roumania, Galati - Sidérurgie

    BF#3 Remove burden; clean furnace interior, gunned repair to dust-catcher

  • ARCELORMITTAL

    2012 - Roumania, Galati - Sidérurgie

    BF#3 Gunning stack lining and tuyere area using mobile platform; install carbon blocks; ram stave joints and injection between staves and shell

  • Altos Hornos de Mexico

    2012 - Mexico, Monclova - Sidérurgie

    BF#5 Hot salamander tap, 370t upper stack shotcreting, remove hot burden to below tuyere level to allow tap hole repair - traditional method

    Altos Hornos de Mexico

    2012 - Mexico, Monclova - Sidérurgie

    BH#5 Hot salamander tap, 370t upper stack shotcreting, remove hot burden to below tuyere level to allow tap hole repair - traditional method

  • Lafarge

    2011 - France, La Malle - Cimenteries

    Repair of kiln hood n°2